• Background 01
  • Background 02
  • Background 03
  • Background 04
  • Background 05
  • M/Y 33 m
    Year: 2012/13
    Location: Italy / Croatia
    At the request of owner's, a paint survey was carried out during the entire shipyard period. The topside hull and superstructure were subject to topcoat analysis according to the international standard ISO-DIS-11347.
    Purpose of the survey was to assess and verify if the final cosmetically result of the paint work was in accordance with the ICOMIA technical guideline, minimum acceptable finish and appearance for super yachts gloss coatings.