  • M/Y 43 m
    Year: 2015
    Location: Croatia
    Dismounting of old generators, stripping of main deck saloon, opening of access hatch through the steel deck and installation of new Onan MDDCJ 80kW generators – 2 pcs. Reconstruction of main distribution board fields with installation of Protection and Power Management system, supplied by DEIF (PPM-3).